After obtaining preventive opinions, formal requests were made to the Lake Authority, the Province for landscape authorization, the Municipality. The floating part and the perimeter superstructure were then assembled on the ground; subsequently the unit was placed in water and moved to its destination where it was fixed. Once the finishing and plant engineering works are finished, the prototype will be tested for about six months in order to verify and refine the equipment. Then it will be possible to “replicate” the unit and offer tourists this new adventure of experiential tourism.